ADVERTISEMENT

Edmonton

Water main break temporarily shuts down High Level Bridge

Updated

Published

Traffic flows onto the High Level Bridge on Feb. 18, 2025 after a water main break temporarily closed the road. (Sean McClune/CTV News Edmonton)
Traffic flows onto the High Level Bridge on Feb. 18, 2025 after a water main break temporarily closed the road. (Sean McClune/CTV News Edmonton)